0086-18684963907
ceo@hnironrubikcubemachine.com
Geological Survey Requirements Before Using Rotary Drilling Rigs in Construction
Source: | Author:selina | Published time: 2024-11-21 | 3 Views | Share:

Geological Survey Requirements Before Using Rotary Drilling Rigs in Construction

A thorough geological survey is a fundamental requirement before deploying rotary drilling rigs for construction projects. Equipment like the XCMG Used Rotary Drilling Rig and SANY Used Rotary Drilling Rig excels in various soil and rock conditions, but understanding the geotechnical parameters is essential to ensure safety, efficiency, and precision. This article outlines the key geological survey requirements necessary before starting construction.

1. Determining Soil Composition and Layers

Understanding the soil composition and stratification is vital:

  • Soil Types: Identify whether the soil is cohesive (clay, silt) or non-cohesive (sand, gravel).
  • Layer Stratification: Map the sequence of soil and rock layers to anticipate changes during drilling.

The XCMG Used Rotary Drilling Rig is equipped to handle diverse soil types with precision, making it ideal for complex stratifications.

2. Measuring Load-Bearing Capacity

Geological surveys should assess the load-bearing capacity of the soil:

  • Pressure Tests: Perform tests like Standard Penetration Tests (SPT) to evaluate the soil’s strength.
  • Shear Strength: Determine the soil's resistance to shearing forces to ensure stability during and after drilling.

The SANY Used Rotary Drilling Rig operates efficiently in both high and low load-bearing soils, adapting its torque and speed accordingly.

3. Identifying Groundwater Levels

Groundwater significantly affects drilling operations:

  • Depth of Water Table: Locate the water table to plan casing requirements and drilling fluids.
  • Flow and Pressure: Analyze groundwater flow and pressure to prevent borehole instability.

The XCMG Used Rotary Drilling Rig integrates advanced fluid management systems, ensuring borehole stability even in high groundwater conditions.

4. Assessing Rock Hardness and Density

For sites with rock layers, geological surveys should evaluate:

  • Hardness Testing: Use Mohs scale or rebound hammer tests to assess rock hardness.
  • Density Analysis: Determine rock density to select appropriate drilling tools and torque settings.

The SANY Used Rotary Drilling Rig excels in penetrating dense rock layers while maintaining efficiency and precision.

5. Evaluating Site Accessibility and Hazards

Surveyors must also examine logistical and safety aspects of the site:

  • Access Routes: Ensure the site is accessible for heavy machinery like the XCMG Used Rotary Drilling Rig.
  • Hazard Mapping: Identify underground utilities, existing foundations, and environmental constraints.

Proper logistical planning ensures seamless operations and reduces downtime.

6. Customizing Drilling Plans

Based on the survey findings, customize the drilling approach:

  • Tool Selection: Choose appropriate drill bits and augers compatible with the geological conditions.
  • Drilling Speed and Torque: Adjust the settings of the SANY Used Rotary Drilling Rig to optimize performance.

Conclusion

A comprehensive geological survey is a critical prerequisite for construction projects involving rotary drilling rigs. By leveraging insights from soil composition, groundwater levels, and rock density analyses, contractors can optimize the performance of machines like the XCMG Used Rotary Drilling Rig and SANY Used Rotary Drilling Rig. These surveys not only enhance efficiency but also ensure safety and project success.

SEO Keywords: XCMG Used Rotary Drilling Rig, SANY Used Rotary Drilling Rig, geological survey, construction drilling, soil analysis, rotary drilling preparation.

READ MORE:

READ MORE:

READ MORE:

READ MORE:

READ MORE: